Moral: ICAD, KBE, and truth engineering
The last post presented responses by GenAI/LLM types to my writings on KBE. Not bad in terms of regurgitation. What we are dealing with are mirrors and halls of mirrors. We will get there and explain this more thoroughly.
Before we get to that point, I need to bring forward information obtained from work in the '90s and the 2000s (as in, pre-2010) that applies directly to knowledge systems helping people who are heavily trained and very much mathematically astute. That's the KBE part.
Tonight, I was reading on constraint satisfaction which was a huge part of the object-oriented modeling of ICAD which I used for 15 years to solve problems of note. Where is this known? In the industrial / commercial world, we did not get lots of air time. You solved a problem and moved on. KBE was in that situation, for the most part.
But, poking around, I have found sufficient material to pull together an explanation for why KBE was, and is, important. Of note, my view is from the role of engineering support (where the mathematicians hang out) as I am not a degreed engineer. But, I was there, working on teams, observing, and have studied the whole of the basis for that phenomenon for two decades now. Of late, I have been discussing matters with folks of that training.
Let's start with some links. These are related to the theme of ICAD, KBE, and truth engineering from several levels and angles, including the top-down issues plus plenty of technical material. Some of these are articles are recently recoverd (use of the "wayback" approach, for instance).
- Papers (technology, computing, ...) - The Thomas Gardner Society, Inc. is supporting this work as important to the future. Some papers are listed at this site.
- Knowledge Based Engineering (KBE): Update - Contemporary look at the issues seen during a major project that successfully did the deed of digital definition on a huge scale.
- Geometric/Knowledge Modeling Challenges - Anticipating the "twin" that has been brought forth digitally.
- Knowledge-based Engineering and the ICAD System -
- Practical Issues of AI - From a 1994 look at the issues, after a major accomplishment was seen.
With regard to ICAD, we see this from 2001.
And, this refers to activity that was precision work within the situation of complicated processes. Not mindless pretend by misusing mathemtical computing, as we seem to be witnessing."For example, at Airbus UK, the design of Wing spars was reduced from 480 man weeks to 12 - a 97.5% lead-time reduction. Similarly, Jaguar Cars saw a 94% lead-time reduction in XK8 body panel development, and their collaborative headlamp program was reduced from 8 weeks to only 2 days."
![]() |
| CAD to ICAD |
- Scenario-Based Affordability Assessment Tool - From Wright-Patterson, this is an indication of the power of KBE. Glueware was one major facility which helped handle the complexity of different types of representation needed to handle real world dynamics.
Remarks: Modified: 10/24/2025
10/24/2025 --


No comments:
Post a Comment